Septic Slowdown Until September?
By Chris Finnie On June 19, 2012, the State Water Board adopted the Water Quality Control Policy for Siting, Design, Operation, and Maintenance of Onsite Wastewater Treatment Systems—what most of us call septic systems. The goal is to protect groundwater and surface water. At the time it was adopted, theRead More →